Thursday, 14 February 2013

Planning - Shot Log

Hello readers,
 Whilst filming we recorded shots taken on a pre-prepared shot log. This enabled us to ensure we took the necessary shots and fulfilled the correct time of the take. Without this, we would not have been able to keep track of the shots taken and could have potentially undershot. Having previously shot test shots within the garage, we felt it wasn't necessary to re-shoot these (despite being fairly unexposed, we felt this enhanced atmosphere) so this is why these shots are not included within this log. We also did an extra shot of the captor carrying the victim into the caravan; this take is also not logged, as it wasn't our original plan to include it and until we produce a draft edit we are still unsure if we will include this.


No comments:

Post a Comment